Oh those backburner UFOs! Not too bad, actually. I've got a sock pattern a knittin' on skinny double points. Don't know why I side-tracked on these, but today I am back at it. Then there's the rust-colored chunky cardigan that's sitting waiting for more pieces to be completed. I am using Lion Brand Chunky Wool Ease to make this sweater. So far, the back is done and now I need to get knitting on the two front pieces, and then the sleeves. There's been a lot of garment sewing being done at the Casita, that's why the lapse; however, with the change of the season, my thoughts have drifted back to knitting and crochet. Not too bad; just two unfinished projects on the table. These will be done before Christmas I do declare.
Friday, October 24, 2014
What's up, Knitty Noodle?
Oh those backburner UFOs! Not too bad, actually. I've got a sock pattern a knittin' on skinny double points. Don't know why I side-tracked on these, but today I am back at it. Then there's the rust-colored chunky cardigan that's sitting waiting for more pieces to be completed. I am using Lion Brand Chunky Wool Ease to make this sweater. So far, the back is done and now I need to get knitting on the two front pieces, and then the sleeves. There's been a lot of garment sewing being done at the Casita, that's why the lapse; however, with the change of the season, my thoughts have drifted back to knitting and crochet. Not too bad; just two unfinished projects on the table. These will be done before Christmas I do declare.
Thursday, January 24, 2013
Rigid Heddle Knitter's Loom; Silky Merino, Hot Pink
This neck scarf, woven on my Ashford Rigid Heddle Knitter's Loom, measures 6-1/4" wide by 54" long. This silk/merino wool yarn is very nice to the touch and the scratch factor is minimal. I'm trying to remember where I picked up this yarn, but it's been such a while ago that I cannot remember. The weft (horizontal strands) pattern is divided as follows: 9 strands beat close together, followed by 4 strands equally spaced about 1/8" apart. Oh so simple, but a happy accomplishment for my beginner efforts. Once the loom was prepped, the weaving took two days of undedicated effort. In this picture, I am working on the fringe.
Thursday, January 17, 2013
Girlie Toddler Poncho
Here's a crocheted toddler poncho. This is a child's size, 18-24 months. I thought I might add a fluffy little pompom to each picot point around the border. The sparkly thread that runs through the yarn is charming as a whole, but it's slightly scratchy to the touch, so this poncho may end up for display only. I'm thinking a little girlie might prefer a little poncho with a soft, cuddly touch.
Wednesday, January 16, 2013
Rigid Heddle Knitter's Loom

Here is my 12" Ashford Rigid Heddle Knitter's Loom, strung with Cascade 100% Peruvian wool yarn on the warp (vertical strands), and a unique skein of silk sari yarn for the weft (horizontal strands). I enjoy weaving more than any other crafty thing I can think of. This is a small loom, easy to handle, easy to work with. I've had it for at least a few years, but haven't done much weaving up until now. The scarf (pictured below) was completed in two days. Finished measurements are about 8" wide by 48" long. I could be happy working with this loom alone, but it would be so nice to have a wider loom in order to weave a wider cloth. There's something magical about weaving one's own cloth and then putting it to good use; being able to weave a wider cloth, imagine the possibilities!
Thursday, October 18, 2012
Poor knitty noodle!
Poor knitty noodle...me! Knitting has been on the back burner since I finished those socks a while back. Quilting and garment sewing are what I have been up to. Plus there's the garden that needs sorting out before winter comes; fall cleanup and all that. My needles are currently silent, but I'm thinking it's time to pull out some yarn and start a project. I've got a fabulous Noni bag pattern that needs to be made; tres chic! I will need to dig out that pattern and post a picture for all to see.
Friday, January 6, 2012
3 down; 2 to go...
At long last, three pairs of socks completed. Now I have two more pairs to knit which I have promised.
Wednesday, December 21, 2011
Last-minute Knitting Frenzy!!
Close to finishing another pair of socks. Need to send these to Las Cruces, NM, hopefully before Christmas. I only had to make two sets. Oh why, oh why did I wait so long???
Subscribe to:
Posts (Atom)




